Commercial & Entertainment

Pantheon – Athinon Arena

Project & Construction Management of the new multifunctional concert hall and 5 star luxury Suite-Hotel, located in Athens, 166 Pireos Avenue, on account of Papatheocharis Group. A total area of 22.000 m2 is occupied. The architectural design was elaborated by AS.P.A. S.A. The works lasted 7 months, starting from March, 2004.

Total surface: 22.000 m2
Starting Date: May 2004
Project Duration: 7 months

Images

Village Entertainment Park

Project & Construction Management for the refurbishment of the well known entertainment park, located in Athens, Rendi, which expands over a total area of 15.600 m2, covering 2 floors and an underground parking level. Project employer was TRIVILLAGE DEVELOPMENTS, member of the Pradera Asset Management PLC group. The architectural design was elaborated by ZEGE SA. Starting from November, 2007, the project works went on for 12 months.

Total surface: 8.150 m2
Starting Date: September 2007
Project Duration: 6 months

Images

Michalarias Art

Refurbishment of the Neoclassical building in Kifissia, into the Michalaria Art Gallery.

Images

Media Markt S.A

Project & Construction Management for the construction of the new Media Markt building (15.000 m2), comprising of 3 levels plus an underground parking level, at the crossroad of Athinon and Thivon Ave. (Peristeri), on account of Apostolou A.B.E. The designs were elaborated by C.V.Z. HELLAS E.P.E. The works were initiated on April 2006 and reached completion within 7 months.

Total surface:15.000 m2
Starting Date: April 2006
Project Duration: 7 months

Images

Golden Hall

Project Management for the conversion of the International Broadcasting Center (IBC) of the 2004 Olympic Games into a high-end shopping mall, comprising 3 floors of commercial stores and dining areas and 2 underground parking levels, on account of LAMDA DEVELOPMENT S.A.

During the first phase, the construction works were realized according to Frank Basil’s construction management process in co-operation with several subcontractors, whereas the second phase (fillings & wall claddings) was executed by J&P-AVAX as a general contractor.

The shopping mall expands over a total surface of 75.000 m2 and its architectural design was elaborated by AS.P.A. S.A. The project works commenced in July, 2007 and lasted 16 months.

Total surface: 75.000 m2
Starting Date: July 2007
Project Duration: 16 months

Images

Factory Outlet S.A

Project & Construction Management for the 2-storey “Factory Outlet” building plus underground parking level (total surface 15.000 m2) located in the area of El. Venizelos International Airport, Spata. Project Employer was Factory Outlet Airport S.A., whereas the architectural design was elaborated by AETER. This was a 14-month project, starting from July, 2005.

Total surface: 15.000 m2
Starting Date: July 2005
Project Duration: 14 months

Images

Armani Building

Project & Construction Management of the refurbishment of a building located in the center of Athens (Kolonaki)

Total surface: 800 m2
Starting Date: 2002
Project Duration: 5 months

Images

Syggrou Agora Center

Project & Construction Management for the following purposes: a) renovation of Diogenis Palace building and construction of an additional 4-storey building with 5 underground parking levels (3.600 m2 total) while simutaneously b) the construction of a new 4-storey building with 7 underground parking levels (8.100 m2 total), at 259 Siggrou Ave. Project Employer was Papatheocharis Group and the project architects were AS.P.A. S.A. The works started in June 2007, and lasted 24 months..

Total Surface: 10.000 m2
Starting Date: June 2007
Project Duration: 16 months

Images